Call Back From

 

PROJECTS

 
PJSC Myronivsky Hliboproduct
  • TT-Group
  • TT-Group
 

The following spectrum of work was carried out at industrial sites of PJSC Myronivsky Hliboproduct:

 
Project 1Office of PJSC "Myronivsky Hliboproduct". Kiev.
 

The total area of the premises in the office building is 10 000 m². In addition, under the building, there is a garage with a total area of 12 000 m². For cooling the premises, used chiller-fancoil system, including 400 «GEA» (Germany) fan coil units and two «Fast» (Italy) chillers with a productivity of 450 kW each in a one-unit version with air-cooled condenser. The building has 14 supply and exhaust units with a recuperation system of 4000 to 22000 m³/h. In the air-handling units, plate recuperation units with an efficiency of 60% are used. To maintain the microclimate in the rooms was installed 12 humidifiers «Carel» (Italy), productivity from 12-64 kg of steam per hour. For premises of a server installed precision air conditioners channel type with a total capacity of 120 kW. In the kitchen, exhaust ventilation system based on fans of Ukrainian production. Smoke extraction systems and supply in staircases are made on the basis of Ukrainian fans. Our company has developed a project, all installation works, piping, start-up and adjustment of climatic systems. In addition, a system for dispatching fan coil units based on «DEI» automation (Taiwan) has been built. The total number of ducts in the building was about 8000 m².

 
Project 2Factory of semi-finished products "Legko". Myronivka city, Kiev region, Ukraine.
 

Our company has complete the project of the ventilation and air-conditioning systems, has completed the delivery of equipment and installation. As ventilation system used 16 air supply and 16 exhaust units «PETRA» (Jordan) from 4000 to 32000 m³/h total capacity of approximately 300,000 m³/h air supply and exhaust. For conditioning, 60 «PETRA» fan coils are used. Cold water for the air conditioning system is obtained through an intermediate heat exchanger from the ammonia station. In the ammonia pumping station, an emergency vent system was implemented on the basis of fans manufactured in Ukraine. The ventilation of the warehouse, sewage and pumping station, garage also completed by our company. In project used the «Grundfos» pumps (Germany), «Belimo» Automation (Switzerland), the Ukrainian automatic control panel by «Raut».

 
Project 3Poultry factory “Snyatinskaya Novaya”. Snyatin city, Ivano-Frankivsk region. Factory producing foie-gras.
 

The project, delivery of equipment and installation of the ventilation and air pre-cooling system for technological purposes have been completed. The pre-cooling system operates on the basis of a low-temperature chiller «FAST» (Italy) with a productivity of 850 kW, operating on glycol in the temperature range from minus 2 to +3 °C. To reduce the temperature in the technological premises of slaughter of geese, 25 high-pressure «FAST» fan coils are used. Thus, the temperature of the air entering the room is reduced to 12 °С. The total capacity of ventilation systems is about 10,000 m³/h. We have been install air ducts of own production, cooling system pipelines also have been installed by our company.

 
Project 4Slaughterhouse in Stepantsy, Cherkasy region.
 

Our company participated in the development of the project of the climatic systems of the slaughterhouse of chickens in the village Stepantsi by «Nasha Ryaba» trademark. In addition, we carried out the delivery of equipment, installation and commissioning of ventilation and air conditioning systems in the main production hall, office, garage, treatment facilities. For ventilation of premises, more than 40 supply and supply-and-extracting units «GEA» (Germany) with productivity from 2000 to 80000 m³/h are used. The overall performance of all ventilation systems is about 850,000 m³/h. The air ducts with a total area of 25,000 m² are manufactured and installed. The exhaust systems are built on the basis of «Casals» fans (Spain). 40 «GEA» fan coil units are used to cool office space. Cold water is supplied from an ammonia compressor unit through an intermediate heat exchanger. Circulation in the cooling circuits is provided by «Grundfos» pumps.

 
Project 5
 
The project of the ventilation system of the main production building, the first stage of construction of the Vinnitsa poultry
factory in the town of Ladyzhin, Vinnytsia region.

Our company has carried out the project of ventilation systems for the main production building of the first stage of construction of a poultry farm. The project includes 46 supply and exhaust units «Novenco» (Denmark) 27 of them with cooling function, used in the technological process to maintain the set temperature of air supplied to the process rooms. There are also 27 air-handling units with capacities from 6,000 to 50,000 m³/h, also produced by «Novenco». In addition, there are 57 exhaust systems based on the fans «Casals» (Spain). The total capacity of ventilation systems is about 1 million cubic meters per hour.

 
Other projects
 
Agromars TT-Group Одесса

Agromars

The system of mechanical ventilation

Open project
Auto center

Auto center "Audi Odessa Center South"

Design and installation of heating, ventilation, air conditioning and sewerage systems.

Open project
Official Dealer Center

Official Dealer Center "Adis-Auto"

Installation of a waste oil boiler.

Open project

More projects

 

CONTACTS

 

Sales Department

(048) 777-01-88

sales@ttg.com.ua

Project Department

(048) 777-02-88

project@ttg.com.ua

Technical support

(048) 728-30-51

support@ttg.com.ua

Service maintenance

(048) 777-01-88

service@ttg.com.ua